Answer / asn

Select testplan tab in the testdirector and selecting the
option run all.

Is This Answer Correct ?    5 Yes 1 No

HOW TO RUN SEVERAL TESTS AT A TIME USING TEST DIRECTOR ? WITH OUT USING AUTOMATION TOOL? (FOR EXA..

Answer / preeti

Click on the Run test Set under Test lab in that you have
the option of runnung the test Automatically or manually,
you can either select all test to run or just 1 test.The
run can be done Locally or remotely...by creating a host or
adding new host in the list.Please use the user Guide for
further details.

Is This Answer Correct ?    2 Yes 0 No

HOW TO RUN SEVERAL TESTS AT A TIME USING TEST DIRECTOR ? WITH OUT USING AUTOMATION TOOL? (FOR EXA..

Answer / ramarao

click the run test tab,after that click on tset set builder,
u can set wt testcase u can require for running, take on
keep into one folder after taht wt testcases u have
required for runnning ,all of them put in same folder wt
ever u want.After that u can click on run tab it will be
executing.

Is This Answer Correct ?    2 Yes 0 No

HOW TO RUN SEVERAL TESTS AT A TIME USING TEST DIRECTOR ? WITH OUT USING AUTOMATION TOOL? (FOR EXA..

Answer / sahana

use RUN TEST SET on test lab tab....this might help...!!!

Is This Answer Correct ?    3 Yes 2 No

HOW TO RUN SEVERAL TESTS AT A TIME USING TEST DIRECTOR ? WITH OUT USING AUTOMATION TOOL? (FOR EXA..

Answer / nitin taneja

Automation tool has to be used...for this purpose u have to
have atleast one automation tool like winrunner or qtp
installed on ur server....after u write test cases for a
test in TD u can automate them (generate a test
script)....after that include all the test that u need to
run under one test set. then the tests need to be scheduled
by putting a time and date stamp to them so that they run
at ur desired time....click the run test set option under
test lab and choose the run all test option in the
execution dialog box.....the tests go into waiting mode
till the server time matches the predefined time for tests
that the user provided and then the execution starts!!
tada!!

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Test Director Interview Questions

What is the difference between winrunner and test director?

0 Answers  


How to generate the graphs in test director?

0 Answers  


What is the Extra tab in QC ? (TCS)

1 Answers  


Explain the procedure of connecting testdirector in qtp?

0 Answers  


What if you delete a test from Test Lab will it updated in Requirements/Test Plan tabs also.

3 Answers   Ordain Solutions,






After you have completed the first phase of running the 'Test Cases' in TD, now that you have set the status of each step as Pass/Fail. How will you run the same 'Test Cases' for regression testing (say for 2rd or 3th build)?

5 Answers   HCL,


Explain about user authentication in TD related to OS?

0 Answers  


In automation testing(QTP), how we find the bugs?

5 Answers   Accenture, Mind Tree,


What is the difference between Qualtiy center and Test Director?

16 Answers   AMAT, Mastek, Texas Instruments,


which is the latest versions of winrunner ,qtp, test director companies now using in real time?

7 Answers   Kanbay,


Explain the project tree in test director?

0 Answers  


can we connect qtp 8.2 version with test director 8.0 verion if how if not why 2)when test director 8.0 version released

0 Answers  


Categories