Suppose delivery ,pgi and billing has been done.but we have
made a wrong delivery.we want to reverse the document.how?
Answers were Sorted based on User's Feedback
Answer / swastika
If Billing doc is created for the wrong delivery then 1st
we need to cancel the billing doc with t.code= VF11.
Then we need to reverse the PGI with t.code= VL09
Then we need to delete the delivery doc with t.code =VL02N.
NOTE: you cant directly reverse PGI without cancel the
existing billing doc.
Thanks
Swastika
Is This Answer Correct ? | 7 Yes | 0 No |
Answer / arun
once pgi done,u have to cancel the pgi
also..
Other wise u cant edit delivery..
Vf11 opens billing doq only..
Is This Answer Correct ? | 0 Yes | 1 No |
In third party sales i am getting error "NOT POSSIBLE CONSUMPTION ACCOUNT DETERMINATION" Please help me how to resolve it Thanks in advance Ravindra chavamba@gmail.com 9535785219
After setting up a batch job (schedule the backlog report) by T Code SM36, i am getting error mail from user saying that, the reports r not recieving to his mail box, can any one help me regading this, how to resolve?.....it will be greate help.. Thanks
Is it possible sales organization sell from a plant belonging to a different company code?
what is the match code and use?
Why reconciliation value is set standard to 14000 while creating a customer?
how can u determine separate pricing procedure in invoice. urgent can u post the solution
how to do partical delivery?
Hi can any body send me some golive and production support issues
What Time Neede to Upload Master Data and Trasaction Dat From Non SAP Systum to SAP Sys. through LSMW Tool ?
How can I track any change in the number range settings by user. I dont find any history tab in T.Code VN01. Thanks Naresh
What is condition exclusion?
What is document type?