If there is no sufficent time for testing & u have to
complete the testing then what will u do?

Answers were Sorted based on User's Feedback



If there is no sufficent time for testing & u have to complete the testing then what will u do..

Answer / hary

i think better option is to do "Risk Analysis", so that we
can complete testing in lesser time

For more details contact me

Hary

Is This Answer Correct ?    9 Yes 0 No

If there is no sufficent time for testing & u have to complete the testing then what will u do..

Answer / rakesh

1. List out areas/functionality to be tested and not to be tested from user perspective.
2. Set priorities for test cases to be executed.
3. Perform UAT.

Is This Answer Correct ?    3 Yes 0 No

If there is no sufficent time for testing & u have to complete the testing then what will u do..

Answer / shivanibehere

When I have less time to test the Product then I will take
these following steps---
1) Sanity or smoke testing
2) Usabilty Testing
3) Formal Functionaltyand GUI Testing
4) Walkthrough with the Prduct
etc......

Is This Answer Correct ?    3 Yes 1 No

If there is no sufficent time for testing & u have to complete the testing then what will u do..

Answer / kumar raju

I will do the following testings
1. Sanity testing
2. Adhoc testing for functional, Integration & system
testing
3. UAT

Is This Answer Correct ?    2 Yes 0 No

If there is no sufficent time for testing & u have to complete the testing then what will u do..

Answer / surya

Murali u r absolutely wrong b'caz when u have time to do
those many types of testings then istead of that u can do
normal testing only ... think over it

Regards,
Surya

Is This Answer Correct ?    1 Yes 0 No

If there is no sufficent time for testing & u have to complete the testing then what will u do..

Answer / kishore sharma

I that case the smoke testing would be best practice.
Sanity testing also does not make any sense as it involves
through validation testing.
Exploratory is done when there is no documents for the
system based on which you can prepare prepare your test
cases.

Suggestions are welcome

Regards

Is This Answer Correct ?    1 Yes 0 No

If there is no sufficent time for testing & u have to complete the testing then what will u do..

Answer / rugvendra

There should be enough and sufficient time tio carry any
kind of testing ,if there is no such time constraint we can
check functionality and Usability testing as we do in War
room having only the basic feature of the fuctionlity

Is This Answer Correct ?    1 Yes 0 No

If there is no sufficent time for testing & u have to complete the testing then what will u do..

Answer / maggi

If there is less time to test an application better use risk analysis procedure.

Is This Answer Correct ?    1 Yes 0 No

If there is no sufficent time for testing & u have to complete the testing then what will u do..

Answer / satyanarayna

In this type of situations we have to analyse the major
functionalities in that application as per the client .
Then we have to go for adhoc testing or exploratory testing

Is This Answer Correct ?    0 Yes 0 No

If there is no sufficent time for testing & u have to complete the testing then what will u do..

Answer / tvl

Best one is sanity testing

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Manual Testing Interview Questions

1.how you know all test cases are cover in one application? 2.what is difference between error message and warning message ? 3.what are the items comes under traceabily materix?

7 Answers   iSoft,


by testcase how to achieve 100% branch coverage for the following code. Read P Read Q Print "P" Print "Q"

2 Answers   IBM, ISTQB,


if u login sucessusfully in page and reach the 2nd mailing page where u find u are getting only few mails not all then wat would u say test is pass or fail

4 Answers   Sapient,


What are the testing processes after getting SRS to tester?

2 Answers  


is gorilla testing & monkey testing is same r not?

5 Answers  






When they freez(baseline) the requirement means in which phase of sdlc

5 Answers  


write a single scenario which describe error , bug and failure.

3 Answers   CSC,


what is sdlc?explian test plan.

2 Answers   Symphony,


What is backward compatibility testing?

3 Answers   MedUSA,


What is back to back testing?

0 Answers  


which phase is most important in STLC phases? and why ?

2 Answers   IBM,


why Test plan is needed??

5 Answers   Oracle,