Hi,
I have run the standard cost estimate for one product. Can
any one tell me the planning steps for 100 products.
Sravan
Answers were Sorted based on User's Feedback
Answer / gopi
Parallel running for 100 products is not advisable at header
level and CK40N is the correct transaction.
Is This Answer Correct ? | 10 Yes | 0 No |
Answer / uday kumar y
CK11n is used for standard cost estimation.
to run that we have to run ck24 also.
Use CK40N f0r 100 products
Is This Answer Correct ? | 5 Yes | 0 No |
What is MRO area & MRP group & some difference
How many standard value keys can you mention at work center
What are the MRP master data?
If the scenario is''Party is supplying some material we have to do the some processing operation on it, how it cab be handled in SAP"
What is time phased Planning?
Explain what is sap pp?
What is the difference between by-product and co-product and how do you differentiate them in a BOM?
while extending the material master view after saving error is coming that the field material number is defined as a required field,it doesnt contain an entry. After selecting that it is showing the particular material may be locked. Pls do the needful.
Can’t one material be assigned to more than one operation in a routine?
• How are basic order dates determined?
Can any body explain me why work scheduling view is required for semi finished and finished products?
Do you need to use different BOMs for different applications, such as Production, Engineering, Plant Maintenance, and Costing (BOM usage)?