what is requirement class and requirement type? and what is
the difference between them
Answers were Sorted based on User's Feedback
Answer / paul scholes
Requirement type specifies what type of requirement it is
...Sales order requirement or delivery requirement
requirement type points to requirement class which specifies
if TOR and availability function should be carried out or not.
This is a very concise explanation though.
Is This Answer Correct ? | 10 Yes | 1 No |
Answer / rajiv trivedi
Requrement Class : In ATP it is used. It contains all
control feature for planning such as relevance for
planning, req. planning strategy and requirement
consumption strategy. In addition, it is specified at a
global level whether an availability check is to take place
for the material in Sales & Distribution documents on the
basis of ATP quantity and whether requirements are to be
passed on. A finer degree of control can be obtained for
the sales document using th schedule line category.
Replenishment lead-time is only included in the check
performed on the basis of the ATP quantity.
SPRO -Production-Production Planning- Demand Management -
Planned Independent Requirements - Requirements
Types/Requirements Classes
Requirement type 41 and class also 41
is generally used.
The requirements type and, eventually, requirements class
are determined in the strategy group tcode MM02 - MRP 3
view under planning.
Requirement Type: Various requirement types are identified
by thier requirement type. This refers to the requirements
class and its control features which is assigned to
requirement class.
It is a factor in condition technique that restricts access
to a condition table. the system only access a condition
table to determine the connected/assigned requirement class
or price if the requirement specified has been met.
Trust this clarify. Please read/learn on ATP concept so you
will get clear idea
rajiv2856@yahoo.ca
Is This Answer Correct ? | 4 Yes | 4 No |
Answer / subha
requirement type and class comes in TOR AND ARE THE PARTS
OF TOR9 trnasfer for requirement)
Once the order or delivery is confirmed we need to create
a transfer order to MM for realeasing the the material and
also to check the availability of the material this process
is Called as REQ TYPE
The requirement class is a border way of req type. b . One
req type can be given to one req calls only but one req
calls can have no of req types
Is This Answer Correct ? | 1 Yes | 5 No |
Hi All, I hope all SAP professionals are doing well. I am looking for SAP SD training institutes from Bangalore. Please I can't go for SAP authorised training centers as they cost very much I can't afford that much on training. So please advise me the good institutes were i can recieve SAP SD training in Bangalore with more practical and in hand project knowledge. I have experience in Sales and Marketing with MBA. Please let me know. I hope i will get good number of suggestions !! Thanks to all !!
What is an ABAP Query? How is it different from ABAP reports?
In how many ways a sap system can interact with third party system. please provide the details to understand well about interfaces
Without maintaining customerpricining procedure(CPP) can we maintain pricing procedure determination, if yes then how.
What is the difference between customization and configuration?
What is the client specific data? Give two examples of client specific data?
How variant is used in reporting?
What do you know about forward and backward scheduling and how you will identify either backward or forward scheduling takes place in sales order
What is the difference between ERB and ERU account keys?
What are the standard reconciliation accounts to be posted in CMR?
Can we assign multiple codes to a company is it possible if how?Urjent....... Thanks in advance....
Where do you assign mo0vement types ?