In one plant id fan and fd fan are used for boiler. boiler is used to heat water after some days they install one tank to heat water by hot flue gases coming out from boiler and then hot flue gases are used to heat the air coming from fd fan before leaving out from chimney . but hot flue gases are not coming out from id fan what might be the reason?
TATA,
3 4853I am opertaing generators which are beyond 14000hrs and now the fuel consumption is about 2kw per liter of diesel. The engines are due for overhauling. is this normal
1 2616can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
1737We know primary ,secondary air so, What is the work of Tertiary air in Thermal power plant
NPTI,
2 3450Power plants are called CPP,IPP,LLP What is the meaning of it? And tell me some other type of powerplant names.
1 5690How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
2290why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
3257Post New Power Plant Engineering Questions
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
Why superheated are started before I'd and rd fan?
operation
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
can dp type level transmitter work in under vaccum condition
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
procedure of how to generate power in solar plant.
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
why do you consider yourself a suitable candidate for this position
what's the moog valve
By any way can we increase the B check hours from 300 to 500
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
what is the difference between compensated & normal drum level in boiler drum?