waht is the use of validation and substitutions, what is the
difference between validation and substitutions? where did u
use validation and substitutions in real time(any person
tell answer only real time not book thiry)how to configure?
Answer Posted / geevidhyadhar
HI
Validation is a little trick ( rather a technique ) which
acts like a watchdog and ensures that incorrect data does
not get posted while posting a transaction. A validation is
a procedure which is on the look out for incorrect data; if
incorrect data is entered by the end-user during document
posting, the validation spews out an error message and
cautions the end-user. The severity of the message can be
mild which only warns but lets the end-user post the
document. On the other hand, a validation can be configured
to throw a serious error message and prevent incorrect posting.
A Validation is given a name and is assigned to a company
code. A validation may checks data
at document header level only (called as callup point 1) or
at line item level ( called as callup point 2) or
at the full document level ( call up point 3).
A given validation uses one of the above call up points.
A validation , at the minimum, contains three steps:
Step 1: a pre-requisite ( validation will happen if the
pre-requisite is met). If the pre-requisite is not met by
the document under posting, the system ignores the
validation technique and posts the document.
Step 2: If the pre-requisite is met a check is made for
compliance of an extra condition (over and above the
pre-requisite). If the condition is also complied with by
the document, then posting happens.
Step 3: On the other hand, if the check activity is not
complied with, then the system smells a rat and throws an
appropriate error/warning message ( depending on the
severity of error as configured by you ).
Let me give you an example of validation from daily life:
Pre Requisite: If You want to Go outside
Check : It is raining outside and you do not carry an umbrella
Your Mom delivers a Message:"Take an umbrella while going as
it is raining outside"
Let us test this procedure:
1. If you do not want to go outside, then the check as well
as the message are not required. Therefore validation does
not happen
2. If you want to go outside but it is not raining outside,
You do not need a warning message. Validation does not happen
3. If you want to go outside and it is raining outside and
you have an umbrella, then you do not need any warning
message. Therefore validation does not happen
4. If you want to go outside and it is raining outside and
you DO NOT HAVE AN UMBRELLA, then you are warned to take an
umbrella. Your Mom delivers a message "Take an Umbrella
while going outside since it is raining "
This is validation.
Substitution is also similar. There is no message. Instead
of your mom delivering a message, she thrusts an umbrella
into your hand. That is substitution.
This is what happens during document posting:
Your validation contains a pre-requisite, Check and Message.
Your substitution contains a check and substitution.
Got it now?
Is This Answer Correct ? | 60 Yes | 3 No |
Post New Answer View All Answers
What is pre-closing? : fi- general ledger master data
Why we do manual clearing?
What is year end closing? How do you perform a carry forward commitment? : cost center accounting
How do perform variance calculation in period end closing? : cost center accounting
what are the organisational elements in sap fi and describe them ?
What is a controlling area? How is it related to a company code? : co- general controlling
tell about gaps in u r progject?
What is a dunning procedure? : fi- accounts receivable
why are you choose sap fi/co
In selection screen I have three fields, plant mat number, and material group. If I input plant how do I get the mat number and material group based on plant dynamically?
What is the clearing basis for check deposit?
What is an asset master? : fi- asset accounting
I'm facing a problem while posting a transaction, the errors showing "withholding tax amount exceed the total line item." I know the anmount calculated is more than the Base amount itself. But as i'm not a FI candidate, I want to know from where I have to change so that I can do the transaction, condition is that I cannot change any rate and code of ewt tax. Pls. help me out, it's urgent.
What does field status group assigned to a gl master record controls? : fi- general ledger
Describe organisational structure in sap ?