What all diffrent type of supply type are three and what
are there use?
Answers were Sorted based on User's Feedback
Answer / navdeepinder singh
There are following supply types:
1. Operation Pull
2. Assembly Pull
3. Push
4. Supplier
5. Bulk
The purpose of putting a supply type is how you want system
to consume the material.
As if you give PUSH type supply the material will consumed
and reduced from subinv as soon as u release the job.
For Operation pull and material will be consumed as soon as
you do first operation on the job while doing the MOVE TXN.
For assebmly pull the material will be consumed when you
will complete the seembliy.
Bulk are issued in bulk and they are low value item like
nuts. bolts etc.
| Is This Answer Correct ? | 8 Yes | 5 No |
Answer / manish sharma
There are following supply types:
1. Operation Pull
2. Assembly Pull
3. Push
4. Supplier
5. Bulk
6. Phantom
7. Based On Bill
The purpose of putting a supply type is how you want system
to consume the material is right as described by
Navdeepinder above.
As if you give PUSH type supply the material will consumed
and reduced from sub inventory as soon as u release the
job.
For Operation pull , material will be consumed as soon as
you do first operation on the job while doing the MOVE TXN.
For assembly pull the material will be consumed when you
will complete the assembly.
Bulk is issued in bulk and they are low value item like
nuts, Bolts etc.
Phantom : Always used against Phantom Items .
Based On Bill: The supply type defaults to Based on Bill.
This supply type indicates that component requirements are
supplied based upon their individual supply types. You can
override this default by choosing one of the following
supply types: Push, Assembly Pull,
Operation Pull, Bulk, or Supplier
| Is This Answer Correct ? | 3 Yes | 2 No |
Answer / manish sharma
Supplier supply type is used where the material to be
procured from some OSP supplier, could be Jobwork Based or
charged OSP based.Let say one assembly used on Shopfloor
which is recieved from OSP vendor and Vendor make that
assembly after one or two operations including some parts
which they purchased from market/other vendor to complete
their assembly but the cost is only applied against for
complete delivered assembly, in that supplier used to put
supply sype as supplier ,so that the cost of top most
assembly will be considered rather than the internal parts,
which are already operated.
| Is This Answer Correct ? | 1 Yes | 6 No |
What is this error obutained while assiging an operating unit to Business group. "ID & ID for the flexfield segment Legal Entity does not exist in the value set HR_ORGDDF_OUI_LEGAL_ENTITY. (VALUE=5149)
If any person ask what you know about AIM? How briefly we can explain b'coz we cont expalin AIM in short time.
what is an attribute from which we can distingwish an orgnisation and master item organisation?
How many type of BOM are availabe?
In osp cycyle i have one finished goods -FG1 Raw material - RM1 Osp Item - OSP1 Resource -Ospres01 Charge Type -PO Move I assign dept, then i created routing and bom. then i realsed job the PO requestion Generated But when i replace on another OSP ITEM - OSP2 for OSP1 having same attributes i am not getting Po requestion CAn any one help me? Thanks in advance, Raghunandana raghu.nandana@rediffmail.com
Just now i created one organization then i setup wip parameters in discreate jobs i found only one status 'how to update/create other status?
What is accouting class and where is it defined iN WIP?
Will anybody explains abt the modules available in Oracle Apps ????
What all diffrent type of supply type are three and what are there use?
Explain the OSP cycle?
I want to create item in Inv org, why it is not taking,it is taking Master organisation,why give the reason.
how to give an decimal and fraction quantity in transaction like 1.25,3.5,1.999.