how to add 100 for dynamic(correlate value) value
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate Elapsed Time in LoadRunner?
Events are generated, but the script is not generating? Why?
What is the difference between overlay graph and correlate graph?
Parameterization need to be done when only one value need to be passed?
How is automated correlation configured?
here 100user and 8hours time and 500000 transactions what r the inputs nees for this scenario?
what is the difference b/w astralaod and loadrunner?
What is Latency and Bandwidth
How to create a host list for a scenario?
How will you stop the execution of a script on error?
How do you test pop up with LR? My whole application running on pop up. Its a JSP page written on pop up window.
How to run a scenario?