Answer / priyanka

1 cum = 500 no's

Is This Answer Correct ?    5 Yes 2 No

number of standard bricks need 1 cubic meter..

Answer / rajasekar m

476.5 nos

Is This Answer Correct ?    2 Yes 1 No

number of standard bricks need 1 cubic meter..

Answer / lamb

494

Is This Answer Correct ?    1 Yes 0 No

number of standard bricks need 1 cubic meter..

Answer / eakub.molla

=1/(.25*.125*.075)=426.6=430 NOS

Is This Answer Correct ?    0 Yes 0 No

number of standard bricks need 1 cubic meter..

Answer / surendar kumar

According to brick size

Is This Answer Correct ?    0 Yes 0 No

number of standard bricks need 1 cubic meter..

Answer / sachin

If we assume brick size 6inch
then .230 x .080 x .150 = .00276 m3 per brick valume.
So 1 / .00276 = 362.31 no.'s bricks in 1 m3 without morter .

Is This Answer Correct ?    0 Yes 0 No

number of standard bricks need 1 cubic meter..

Answer / anikethanani.14@gmail.com

500 no

Is This Answer Correct ?    1 Yes 2 No

number of standard bricks need 1 cubic meter..

Answer / rohit

505

Is This Answer Correct ?    0 Yes 1 No

number of standard bricks need 1 cubic meter..

Answer / lokesh

500 nos. for 1 cubic meter

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

In which direction is bottom bar of rectangular footing is placed in short or long.

1 Answers   AKC,


how the load will be transfer from pile foundation to soil?

1 Answers   CCCL,


ratio 1:4:8: for pcc. area 1008 cft. thickness 6' what is the quantity we need

2 Answers  


writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order

0 Answers  


What is the difference between EPC,DBOOT and BOOT.

2 Answers   IVRCL, NHPC,






how to calculate Tile skirting

5 Answers   JMC Projects,


for gravel roads in India to get 1feet height how much height we have to fill

0 Answers   Sunrise,


what is column foundation

0 Answers  


what is the out turn of one masson in plastering, masonary work in 8 hours, with limited healper? what is the out turn of corpender in form work? wood work? in 8 hour with limited healper? what is the out turn of bar bendarin 8 hour with limited healper for slabs, beams, coloumn?

2 Answers  


What is the difference between M20 and M25 concrete?

3 Answers   CSC, Focus Energy, ME,


How to calculate plastering for elevated water storage tank

0 Answers  


Sir please Bhel Enigineer trainy test papaers in civil engineering

1 Answers   Bhel,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)