what is the development length formula as per concrete grade
Answer / pushkar vaishnav
It is given by structural designer and it's generally various d40 to d50
Is This Answer Correct ? | 0 Yes | 1 No |
how bridge design is to be start? what is the preliminary step for design? which code of practice is to be used for design? what r the methods used for design? what r the ivestigation r carried out? what r the design criteria for design and loading conditions?
how many cement used in single story residential building per sqft
0 Answers Matrix PMC Consortium,
What is the amount of cement,sand and course aggregate(jully)(in kgs) required for the RCC of an area of 450 square feet and 5 inch depth if the concrete mixing ratio is 1:2:4(cement:sand:jully)?your answer will be very helpful.
What are the specification of good quality sand for plaster and brickwork?
how can i calculate pcc and rcc cu.mtr rate? specify labor and material cost should be diff
where will u provide construction joint on slab?
Why do we use badarpur or crusher sand with coarse aggregate in a concrete mix?
what is the out turn of one masson in plastering, masonary work in 8 hours, with limited healper? what is the out turn of corpender in form work? wood work? in 8 hour with limited healper? what is the out turn of bar bendarin 8 hour with limited healper for slabs, beams, coloumn?
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
What is the difference between nominal mix and design mix?
How do we calculate the building footing calculation ?
Why we select pile foundations