Answer / kaizad
As soon as steam stop valves are closed there is no control on coast down speed of turbine unless vacuum break valve of condenser is opened. Normally it takes approximately 55mins to coast down from 3000rpm to 20-30rpm barring gear speed. We keep watch on all turbo visors parameters in such times
| Is This Answer Correct ? | 16 Yes | 4 No |
Answer / m saqib
there is no control on coast down speed of turbine except vacume breaker.when turbine trip the steam stop valve should be closed.when turbine speed reaches 2800 rpm then we open the vacume breaker .then turbine speed reduce > than under vacume.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / sbr
First off all we have to close prds line valve due to prds pre low and vaccume also low that meens condenser pre high in the case turbine was tripped with low vacume after that close the esv. Why turbine shaft free fall in down when ever having vaccume in condenser rpm slowly dicresed even that time shft having some load then we crose the critical speed some vibrations are coming so first shaft free only can crose the critical speed
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / chinmay kumar patra(npti)
open the vacuum breaker so speed retardation will be high and it will cross the critical speed rapidly.so no danger
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sappy
Max speed at which turbine can rotate with load of maximum load
| Is This Answer Correct ? | 3 Yes | 12 No |
Answer / chanchal rajput
As we closed esv after that speed of the turbine goes to
slow down automatically we can not any thing as it cross the
critical speed , for short time vibration increase but after
that goes slow down and turbine stop .Some turbine run above
the critical speed and some below the critical speed .
| Is This Answer Correct ? | 0 Yes | 10 No |
Answer / ankit
barring gear motor is used to cross the critical speed which is 20-25% of rated speed
| Is This Answer Correct ? | 3 Yes | 14 No |
What is the formula for find out the height of chimeny of a powerplant?
2 Answers Rosa Power Supply Company Limited, Sail,
can dp type level transmitter work in under vaccum condition
what is natural frequency of turbine shaft .
Why superheated are started before I'd and rd fan?
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
Is it not bad to bleed steam from turbine stages before utilizing its energy.
What will happen if the Air Preheater is placed before the Economiser?
6 Answers Bhel, KSPL, Tata Power,
What is creep, resilience.
What is df/dt protection?, How to calculate setting range of 30 MW steam generator???
why not maintain Ph 7.0 in Boiler because 7 Ph is not acidic and not basic.
What happens if air is present in LPH and HPH.
whats plant?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)