Onsite percentage wastage of Concrete, Rebar, Blockwork/Brickwork, Plaster, Floor tiles ??
Answers were Sorted based on User's Feedback
Answer / sjtbehera
concrete wastage can be taken in to individual i.e
sand-5%. aggregate-5%, rebar-2.5% up to 16mm than 5% above
cement wastage can be taken 5%,
brickwork- 7% can be taken. plaster and floor tiles can be
taken -2.5% of all material.
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / karthik rajendren
3% for Concrete & rebar
5% for Brick/Block Work,Plaster& Tile
| Is This Answer Correct ? | 3 Yes | 0 No |
For what purpose bedding is used under storm water drains, explain?
polavaram project is situated inwhich place?
yet i am not got any hallticket from aai junior excequtive exam.any one got application form from aai.
2 Answers AAI Airports Authority Of India,
What is the weight of Plunger used in Vicat Apparatus used for testing of cement for knowing standard consistency.How many grams of cement is generally used for this test?
How much cement will require for 1Rmt Skirting laying
what is the percentage of tolerance in the steel bars
what"s the purpose of damp proof course (DPC)and where it"ll provide?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
can we go for short rcc column without any steel rienfocement carrying truely axial load only???(No other load acting on it such as wind load,earthquake & lateral earth pressure)
what is grade intersection?
area of 8mm rod
In a concrete grade C35A, C & A stands for what and equalent cube strength?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)