Answer / sjtbehera
concrete wastage can be taken in to individual i.e
sand-5%. aggregate-5%, rebar-2.5% up to 16mm than 5% above
cement wastage can be taken 5%,
brickwork- 7% can be taken. plaster and floor tiles can be
taken -2.5% of all material.
Is This Answer Correct ? | 7 Yes | 2 No |
Answer / karthik rajendren
3% for Concrete & rebar
5% for Brick/Block Work,Plaster& Tile
Is This Answer Correct ? | 3 Yes | 0 No |
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
what is the difference between NP2 Class and NP3 Class RCC Hume pipes
How to find arc area with using angle?with out using angle?
How many materials e.g bricks, cement, sand, stone required to build a house for 100 sqft
What are the structural steel & where they are used
how to prepare the bar bending schedule for a given rcc material?It will be more helpful if you explain me with an example?
In which direction is bottom bar of rectangular footing is placed in short or long.
procedure to calulate the how much bag of cement is used for M20 grade?
What is Aggrgate sizes used in a WMM Plant?
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
what is the use of dowels rod..?
what does a civil engineer should know?