Onsite percentage wastage of Concrete, Rebar, Blockwork/Brickwork, Plaster, Floor tiles ??

Answer Posted / sjtbehera

concrete wastage can be taken in to individual i.e

sand-5%. aggregate-5%, rebar-2.5% up to 16mm than 5% above

cement wastage can be taken 5%,

brickwork- 7% can be taken. plaster and floor tiles can be
taken -2.5% of all material.

Is This Answer Correct ?    7 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What materials were used to build the golden gate bridge?

818


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

1833


How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?

5819


how many material required for brickbat water proofing of toilets.

1603


Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct

1021






I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,

1523


acceptance criteria for concrete works

1690


detailed calculation of the amount of cement used?

1635


Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.

1721


What are the uses of layer?

734


dialation means

1846


What should be the standard roof height like to be?

676


how many types of survey and what are levelling instrument?

1561


what is the specific gravity of rubble in plum concert

981


Explain major differences between routing maintenance and major maintenance.

660