extra how much quantity need to fill the actual excavated
quantity.

Answers were Sorted based on User's Feedback



extra how much quantity need to fill the actual excavated quantity...

Answer / mohd ameen

1m3 compacted = 1.8m3 dry excavated.

Is This Answer Correct ?    12 Yes 3 No

extra how much quantity need to fill the actual excavated quantity...

Answer / nadim shaikh

depends upon the material by which the filling is needed

Is This Answer Correct ?    0 Yes 0 No

extra how much quantity need to fill the actual excavated quantity...

Answer / partha mitra

backfilling is 1/3 rd of the excavated qnty.

Is This Answer Correct ?    0 Yes 2 No

extra how much quantity need to fill the actual excavated quantity...

Answer / sjtbehera

actual excavated qty minus RCC qty plus PCC qty of the
structure.

Is This Answer Correct ?    1 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

How can we calculate the no.of bricks per sq.mr?

3 Answers   GTL, Real, Sahyadri,


9*9 1:4:8 ratio using how to calculate the material for 40mm aggregate ,cement &sand please tell me answer

5 Answers  


how to calculate the number of cement bags for basic construction..?

3 Answers   Gammon, Indu Projects,


1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...

0 Answers  


material calculations for I st coatplastering 16mm CM (1:5),second coat CM(1;3)4mm thick,pcc(1:4:8),RCC M20,lime stone masonry CM(1:6)

1 Answers  






What is the tallest man made structure in the world?

0 Answers  


Define What is diversion tunnel in a dam?

0 Answers  


If at site iam supposed to get M30.But by mistake i got M20 mix. How could I differentiate the mix before placing?

6 Answers  


What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?

0 Answers   Shell,


1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 + 1 + 1 x 0 = answer??? pzl tell the rite answer ??

23 Answers  


How much snowcem required per sq. Meter area

3 Answers   Bhushan Power Steel,


how to calculate weight of 1.8 cum of aggregate

0 Answers   Engisol,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)