how much one carpenter can doing shuttering of slab in one day
No Answer is Posted For this Question
Be the First to Post Answer
the beam size (450x1000) effective length is 19.0mts no intermediate supports and top 8nos 32dia and bot 32dia and condition is stragge lap. it is exceeding lap zones and exceed length of bars?
What do you mean by Hydraulic Piling??
How high should the water tank be to provide a 60 psi at base of this water tower?
hide face come to omegle.com ful fill ur desires
how many cement and sand required for 1m2 plastering 1:4 cm
600 brass equal to how many cubic meter..
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
which type of instrument included in plumbing work?name of instrument?
how to calculate the quantity of steel used for construction..
how many labour is required for 1cum of concrete?
What are the methods to do a estimate.
why demand factor less then 1 ?