Is critical speed temperature dependent or speed dependent or both?
please give me production full form
What are the advantages of white metal?
. how will effect of water injection on turbine load and corresponding MW output(not water washing)
hi friends kumar here if anybody of u have essar placement papers than plz send it to me i need it urgently..ok mail id is kskalyani@gmail.com
What is the importance of workshop?
what is the difference between set up of cast iron manufacturing industry and steel manufacturing industry?
Which rays are produced by cobalt-60 in industrial radiography ?
Whether entropy is intensive property or extensive property ?
What is churning effect of turbine
What is extrued aluminum?
Sketch the jacket cooling system?
pls tell me the process to set up a power plant right from the permission from state govt ????
in regenrative cycle why to use two liquid(water&mercury) on steam genration cycle.
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb