Software Interview Questions
Questions Answers Views Company eMail

What is the difference between stack and heap memory?

1 75

What is exception handling in C++?

1 75

What is a custom exception?

1 74

throw Can constructors exceptions?

1 76

What is the purpose of the noexcept keyword?

1 79

What is RAII (Resource Acquisition Is Initialization)?

1 79

What is the purpose of decltype?

1 75

What is std::move?

1 71

What is the difference between std::vector and std::list

1 77

What are friend functions?

1 79

Friend functions can access private and protected members of a class.

1 73

What are static variables, and where are they stored?

1 14

What is a const pointer, and how does it differ from a pointer to a const?

1 15

. Explain the differences between fork() and exec() in C

1 65

How does the C program handle segmentation faults?

1 68


Un-Answered Questions { Software }

What is xml format example?

541


Assignment A software house got a project to automate sales/purchase department of a furniture store. The store management is clearly transferred their requirements to the software house management. There is no chance of changing the requirements afterwards. Software house management use waterfall process model to make the project. Given is the progress flow of water-fall process model In waterfall process model, the deliverable (document) produced in one phase serves as an input to the next phase. Suppose you are a project manager who is leading this project. It is decided to work and complete the project using waterfall process model approach. You are required to develop a plan in which the key task is to decide the deliverable that should be built during and after completion of each phase. Also give a description or required contents that must be included in those deliverables. You are not supposed to make the complete project. All you are required to do is to make a Project plan. In that, you need to give a set of deliverables (documents) which according to you, should be developed in each of the phase (Requirements, Designing, implementation, Testing, Maintenance). Also provide contents which should be there in each deliverable. The contents should be clear and have brief explanation. Note:: There are one folder and one file in the attached folder. The file is named as Assignment 4 write-up which is your assignment write-up. The other folder named Project deliverables is the folder in which you are required to organize and place your deliverables. Name of the document/deliverable saved in each folder should be mentioned in the file named checklist (This file is placed in the “Project deliverables” folder) For Example If you produce a deliverable named Requirement Specification (RS) in the “Requirements” phase. You need to do following tasks 1) Finalize the RS contents 2) Save the file in sub-folder named Requirements 3) Write the name of this document in the checklist file under the heading Requirements. Similarly, you need to make and save deliverables of each phase. Not all phases contain one deliverable. There must be some phases having more than one deliverables. PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ? CHECKLIST ARE: 1-Requirements 2- Designing 3- Implementation 4- Testing 5- Maintenance

6661


How do I check hard drive space?

615


What is the page layout?

166


What are the features of react?

267






How to find out the number of parameters passed into function?

125


Is microsoft getting rid of sharepoint?

462


Is angular 7 is stable?

509


Which are default codes winrunner generates when we start the application?

1713


explain about balanced dimension,

652


You are working on a project that was proceeding well until a manufacturing glitch occurred that requires corrective action. It turns out the glitch was an unintentional enhancement to the product, and the marketing people are absolutely crazy about its potential. The corrective action is canceled, and you continue to produce the product with the newly discovered enhancement. As the project manager, you know that a change has occurred to the project scope. Which of the following is true? A. Project scope changes do not require CCB approval. B. Performance measurement baselines are affected by scope changes. C. Project scope change uses inspection to determine if change has occurred. D. Project scope change uses workarounds to correct unexpected problems with scope change.

799


What is the time and space complexities of merge sort and when is it preferred over quick sort?

783


Explain shallow copy?

697


What do you mean by term 'cash value'?

824


Steps for the execution of an MVC project?

5