Yokogawa Interview Questions
Questions Answers Views Company eMail

what are the different types of terminal lugs used for wiring termination?

5 22890

what is the meaning of reverse action and forward action of control valve...

9 31551

what master plc do?

2 6123

how in the 2 - wire transmitter, 24v supply and the 4ma signal gets in the same path?

1 6690

WHAT IS DIFFERENCE BETWEEN TWO WIRE RTD AND THREE WIRE RTD?

5 42515

What is DCS?

4 11451

Is Hart communicator calibration device or communicating device for transmitter?

4 7936

Can we use twisted pair cable instead of ethernet for communication?

1 7137

How does a redundant controller comes in line when the main controller fails??

3 8318

what is compensation in engineering and what is temperature compensation?

1 4800

WE ARE HAVING YOKOGAWA CENTUM CS 3000 DCS, 2 FCS AND 4 HIS " When the operation Download to HIS message appears: Equalize start. HIS0163 WARNING: Could not connect to equalize destination. (7001) Retrying. Number of retries = 0/1 ERROR: LdXopsLoadMain: connect error 10060 ERROR: LdXopsLoadMain: connect error 10060 ERROR: Processing terminated due to connection error. (7002) Equalization end with errors. HIS0163 ---- ERROR = 3 WARNING = 1 ---- Tell me, please, why and how to solve the problem."

6 22863

we are having yokogawa centum cs3000 dcs in our power plant. i need some of the operator guides NOT to appear in HIS0163 AND HIS 0162 but it shoul appear in HIS0164 HOW TO DO IT?

2120

what is the field bus calble ? what are diffrences in orang colur cable and black coular calble ?

2488

Can I route 110 VDC and 24 VDC in a same Duct for our Interposing relay cabinet? IF yes or NO Please provide me IEEE Std. for the same. Please i required it on Urgent basis, i need to design IRP Cabinets and we have MCC 110VDC and Our Coil side is 24VDC, Please help as soon as possible.

1795

Give us details of your present employment status

6059

Post New Yokogawa Interview Questions




Un-Answered Questions

Explain what is return type of isr?

452


How to create a ddl trigger using "create trigger" statements?

618


Define shared connection? : sap bobi

550


Obtaining formal project plan approval and sign-off is important for all of the following reasons except: A. Stakeholders are able to recommend a project Planning methodology to follow throughout the remaining process groups. B. Stakeholders are aware of the project details, which make them more likely to participate in future project decisions. C. Stakeholders will be more likely to cooperate. D. Stakeholders are aware of the specific details regarding project schedules, budgets, and risks.

911


In Telecom, While call set up what are the Masseges will flow from all network element to each other.

1744






Explain how crm can be helpful in handling emails from customers?

478


Difference between truncate, delete and drop commands?

561


What is purpose of technical id field in equipment master data?

496


What is the largest ram?

539


What are the benefits of using queries?

517


How uwb (ultra-wideband) is different from firewire?

420


While starting hadoop services, datanode service is not running?

242


What is nsobject in ios?

450


What is soap and rest web services?

481


How is a Bill of Exchange discharged? (

2375