how costing is done in pp or how u will know the cost of a
product which is manufactured in ur plant

Answer Posted / nanduri k. prasad

There are different methods of doing product cost estimate.
e.g., Std. cost estimate or variable cost estimate.

From the BOM and routing the total no of components used
for that product is calculated using the price mentioned in
accouting views and from routings each operation cost is
calculated from the activity types defined in workcenters.
Collectively this cost is displayed in Product cost
estimate as cost of manufacture in the T.code CK 11n.

In case of variable cost, all the variables are considered
for the production order and the actuals are considered for
calculating the product cost. It is also posible to have
cost estimates and actual costs from which we can find the
variances.

Is This Answer Correct ?    16 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?

633


In lsmw which is the most important step?

610


What does the use of ms70 followed by mcec get you?

639


What is primary cost and secondary cost?

1255


What is meant by slab?

601






Steps to configure Production order type.

1029


What is "work center" in sap pp and what is the use of data in work centers?

577


How is indian slab and us slab?

641


What is alternate item group?

997


what is the major ticket in your experience

621


What is MRP Profile and MRP Group?

2315


What is the use of data in work centers?

676


What is Inspection Points?

1026


Do you have any idea about Capacity Planning?

1524


List out the activities carried out in production planning?

605