whichever documents prepaired by the FUNCTIONAL CONSULTANT
while implementing project by using AIM.
Answer Posted / aravindreddy
documents prepared by the functional consultant
1.RD 20:Business requirements gathering.
2.MD 50:Module design
3.BR 30:Mapping document
4.TE 40:Test cases
5.BR100:Set up document
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
How to refund for a customer who returns goods and wants a refund for $600 in R12 In above scenarios customer does not want Credit Memo or On- Account Credit, he wants refund check . and as we know we do not issue check from AR. How can we issue Check from AP and how offsetting is done for the same in R12
Substitute receipts and Unordered Receipts
What are the inventory report to check inventory status.
Can Adjustments be imported?
how we can stop the transaction for not transfer to the reporting ledger at the time of entering the transaction in pl
While assigning the security by book in oracle assets..i am unable ot get the asset org in security profile form.This asset org was already defined in org description window.
What is Work Flow of AP,AR, Sales & Purchase
What is the use of operating unit, while configure multiorg?
What are register in India localisation?
What do you mean by controlling buyers workload?
I am created credit memo in at but while trying to complete it showing error message-hz_party_location
can we define 2 different currency revaluation at a time??
What is the Process of Reconciliation Between AP to GL
Payables Applications Technical Reference Manual
difference between 11i&r12