How to calculate the quantity of brick or mortar in m3.
like in 1m3 brick =....no.
.......mortar=....m3
Answer Posted / sudar
The size of the modular brick is 190 X 90 X 90
Mortar Thickness is 10mm
Assume required brickwork volume is 1 cubic metre (m3)
Volume of bricks with mortar
Volume of 1 brick with mortar = 200 X 100 X 100 ( 10 mm mortar thickness on all sides)
= 0.2 X 0.1 X 0.1
Volume of brick with mortar = 0.002 Cum (m3)
Therefore, Number of bricks required for 1 cubic metre = 1/0.002 = 500 No.s
Volume of bricks without mortar
Volume of 1 brick without mortar = 190 X 90 X 90
= 0.19 X 0.09 X 0.09
Volume of 1 brick without mortar = 0.001539 Cum (m3)
Volume of 500 bricks without mortar = 500 X 0.001539 Cum
Volume of bricks without mortar for 1 cum = 0.7695 Cum (m3)
Therefore,
Required amount of cement mortar = 1 Cum – Volume of bricks without mortar
= 1 – 0.7695
Required amount of cement mortar = 0.2305 Cum (m3) (Wet Condition)
Dry volume of a mortar = 0.2305 cum X 1.33 = 0.306565 cum
We Assume the mortar ratio is 1:6 (1 part Cement & 6 Part Sand = 7 Part)
Required amount Cement quantity in brickwork = 0.306565 X 1/7 X 1440 kg
Required amount Cement quantity = 63 Kg = 1.26 bags (50 Kg bag)
Required amount of Sand = 0.306565 X 6/7 = 0.26277 Cubic metre (m3)
Therefore, For 1 cum of brickwork, we need
500 Numbers of bricks
63 kg of cement
0.263 m3 of sand.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the tensile strength of wood?
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
What is the difference between absorption & adsorption and sorption?
What is meant by solid geometry?
Howmuch bend to be provide for 200/600 BEEM
explain the rale of the government in the construction industry
How to calculate chejja reinforcement
what is kribs is supporting?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
Explain the difference between shear and tensile strength.
How to cal. The weight of hollow pipe?
What do you mean by tolerance factor of concrete ?
how to caluclate sienerge qty in construction in ap
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?