Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / ashok kumar chaudhary
Dear Sir,
SOLUTION :-
=((LxBxd)+(LxBxD/2))M3
Here L=2.0M
B=1.7M
d=0.15M
D=0.50M
((2.0x1.7x0.15)+(2.0x1.7x(0.50-0.15)/2))
=((0.51)+(3.4x(0.35/2))
=((0.51)+(0.595))
=1.105 M3 Ans.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
what is meant by residual strain?
How much is the cover for slab?
construction workers how much time take one work or qty
What is oneside mat. And explain
What is GSB gradation
150mm bricks size how many use 4.14 m3
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
Describe Briefly The Various Methods Of Concrete Curing?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
what is the anchorage length of reinforcement.
In cement concrete how to check a quality of material also proportion of material at site ?
what is meant by shear center?????
what is the function of GSB all class ?
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure