Answer Posted / narmada.embeti
The stock belongs to Vendor(he has complete ownership of it),but is kept in our storage location.We will pay for the stock which is consumed but not for the whole stock which is kept in the storage location.
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
Explain the stock requirement list and their uses.
Explain what happens to planned after it has been converted into production order?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
How can I use variable size items?
What is the internal recruitment?
What is the uses of production scheduling profile and what the configure have you done current project
How to attach a drawing for a material to bom ? Is it possible ?
define variable cost
What is a ‘work center’ in pp?
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
What are the types of MIC?
What are traffic lights in mrp?
what do you mean by opening periods
a company needs 12 standard values. how it can be maintained?
I have having 14 years manufacturing experence & 6 years in SAP-PP/QM.Was a core member during implementation.Now I want to work as Functional Consultant in SAP-PP/QM.What should I do for getting the jobs.