After you have completed the first phase of running
the 'Test Cases' in TD, now that you have set the status of
each step as Pass/Fail. How will you run the same 'Test
Cases' for regression testing (say for 2rd or 3th build)?

Answer Posted / vijaya

you can re run test cases on already run cases. The status
of previous runs can be checked by looking into history

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can we upload test cases from an excel sheet into test director?

624


Of course, Test Director has recapped as Quality Center. What is the main difference between 8.2 version and 9.2 version of Quality Center?

1724


Hi All, Im currently getting to grips with the Document Generator in Test Director and have a query. We use TD to link requirements to test cases and I am attempting to produce a report which lists the requirement and the test case it is linked to. I cant see a way to do this as the test case link info resides on the Coverage page and it appears the only field available to display for requirements reports within document generator as those on the 'details' tab. Any tips?

2233


how do you integrate Perl or shell automation scripts in TD?

3478


How can we export multiple test cases from td in a single go?

607






Can you retrieve a test case once you have deleted them in test director?

635


Explain the procedure of connecting testdirector in qtp?

555


How can you run automated test cases td (quality center 9.0) ?

562


Is there any possibility to restrict duplication of defects being created in td?

546


how can we see all fields in test director

1874


Explain about failure options in TD

1813


What are the 3 views and what is the purpose of each view?

637


What is Test Director's API execution tool(VAPI)?

2738


What databases can test director reside on?

611


Can we export the files from test director to excel sheet? If yes then how?

596