Cube tests of concrete are failed at 7 days and 28
days.What is your next action?
Answer Posted / vimalsekar
Well. When Concrete cube test result fails at 28th day then
go for concrete core cutting and check the compressive
strength in it. Number of cores shall be as per the
engineer incharge's decision but should not be less than 3
nos. IS:456 says if the core test fails then go for load
test. IS : 456 also says that NDT can be done . But with
rebound hammer test only surface hardness will be known and
hence this test result is not reliable and hardly anyone
suggests for this test.
Is This Answer Correct ? | 18 Yes | 3 No |
Post New Answer View All Answers
how we check the thickness and line of ceiling plaster.
What is difference between engineering stress and true stress?
What are the uses of layer?
satart to end steps by step process of building construction...? i want to planning theme accuretly
Which tests are performed on soil to decide the type of foundation to be provided.
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
The largest size of paper used in plotter to print the drawing made by Autocad .
What are the applications of cad?
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
What is alternate bid?
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
What are your future hopes for this job?
What is meant by solid geometry?