Cube tests of concrete are failed at 7 days and 28
days.What is your next action?

Answers were Sorted based on User's Feedback



Cube tests of concrete are failed at 7 days and 28 days.What is your next action?..

Answer / imam

NEXT ACTION IS NON DESTRUCTIVE TEST

Is This Answer Correct ?    57 Yes 13 No

Cube tests of concrete are failed at 7 days and 28 days.What is your next action?..

Answer / vaibhav jadhav

Any is code not give the clause regarding demolishing of
structure if cube fails in 28 days. but IS 456 & 516 give
the clause if strength of cube is less than FCK then
proceed for NDT Test i.e Rebound hammer if fail then go for
Ultrasonic test after all the NDT fail then proceed for
Core cutter also if U found result less then FCK then go
for Retrofitting with suggestion of consultant.

Is This Answer Correct ?    33 Yes 2 No

Cube tests of concrete are failed at 7 days and 28 days.What is your next action?..

Answer / abhijit

ensist contractor to hold skilled man power with quallity
material. note the result in daily work progress and mark
on structure which is not as per specification. finally go
for NDT if also structure fails then we have to demolish &
reconstruct the same

Is This Answer Correct ?    37 Yes 10 No

Cube tests of concrete are failed at 7 days and 28 days.What is your next action?..

Answer / nravindran

Go for NDTest, if it is not satisfied go for Core test that
is also failed go for concrete strengthing process As per
structural consultant comments

Is This Answer Correct ?    19 Yes 4 No

Cube tests of concrete are failed at 7 days and 28 days.What is your next action?..

Answer / vimalsekar

Well. When Concrete cube test result fails at 28th day then
go for concrete core cutting and check the compressive
strength in it. Number of cores shall be as per the
engineer incharge's decision but should not be less than 3
nos. IS:456 says if the core test fails then go for load
test. IS : 456 also says that NDT can be done . But with
rebound hammer test only surface hardness will be known and
hence this test result is not reliable and hardly anyone
suggests for this test.

Is This Answer Correct ?    18 Yes 3 No

Cube tests of concrete are failed at 7 days and 28 days.What is your next action?..

Answer / shafqat

Use concrete tester rebound hammer for strength after
calibration.
Perform test as per standard,if results is more than 100 %
of requirement by calibration graph of hammer continue the
structure.

Is This Answer Correct ?    11 Yes 3 No

Cube tests of concrete are failed at 7 days and 28 days.What is your next action?..

Answer / kishorecivil

NDT testing has to be done and if it fails then go for
recto method that is strengthing of concrete and concern is
not demolish it's time taken and it will effect time and
finacial.

Is This Answer Correct ?    8 Yes 7 No

Cube tests of concrete are failed at 7 days and 28 days.What is your next action?..

Answer / prabhakara rao.b

Go for NDT If it is not satisfied go for Core test that
is also failed go for there possibale demolisan that coloum
it is not possible we go for Restrengthing.

Is This Answer Correct ?    4 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL

0 Answers   ACMK,


How to convert N/MM2 TO KG/CM2

2 Answers  


M20 Grade ratio? M30 Grade ratio? M40 Grade ratio ?

30 Answers   AB Group, Aparna Enterprises, CECL, Engineers India, intex, Jain Group, Keystone, L&T, Multi Engineering, National, Shrinath Buildcon,


how many bricks are requir for one unit ho we will caculate

9 Answers   L&T, SPL,


what is the difference in density of fresh concrete and hardened concrete?

1 Answers   GPSC Gujarat Public Service Commission,






what is the labour requirement for solid & hollow block work

1 Answers  


Formula for Calculating the Quantity of eccentric footing

1 Answers   NCC,


What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????

0 Answers   Lodha,


how to calculate rate analysis of M25 grade concrete

8 Answers   Nagarjuna Construction, Simplex,


How to find concrete quantity for a circular column ?

2 Answers  


use 1:1.5:3 concrete footing size 9'9" *9'9" and square 12" and also trapezoidal 22" use of 4 columns. calculate how much amount f concrete use. and also tell me the details about course aggregate and fine aggregate and cement bags use .(note; 20mm coures aggregate use)

1 Answers   CMS,


Wat is meant by Aecron brick?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)