What are the differences between billing document and
invoice?
Answer Posted / sd fox
The basic difference between billing document is
Billing document created before the data transfer in the
accounting.
Invoice is created after generating the accounting document.
| Is This Answer Correct ? | 37 Yes | 19 No |
Post New Answer View All Answers
How many cons. Does u have in your project?
How can one billing document type has 2 different number system? Basically if there are two documents belonging to same document type but for two different plants, then how come they both have different number system?
What is a partner type? Give some example?
how will you identify which clear is relevant for your configuration?? In sap sd??
Outline the process flow for sales returns.
How can one inactivate or block a special stock partner? Intent is to disallow transactions to this consignment location as part of lifecycle mgmt.
To extend material one plants to another plant what are the configuration you done in your project?
Explain the relationship between sales organizations and plants.
Shipping point on the sales order shipping tab there is a field with the text “shipping point.” I would like to add new shipping points to certain plants. Where is this configured in sap?
What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling
Steps of tax determination?
In Intercompnay Billing scenario, Does Idocs get posted as we delivery is done from other plant and also the Intercompnay billing happens in the prcess. Though we have the same ERP system i.e. SAP only for all transactions.
Explain how the shipping pint is determined?
What do you mean by order confirmation
What are the views in a material master?