Answer Posted / jinchandramule
COOIS:Production order information system.
Gives you the Detailed information of the production order
like,
ORD NUMBER,MATERIAL,ORDER TYPE,PLANT,START DATE,ORDER QTY,
ORDER STATUS.
Which is used for the information purpose,in Shop Floor
control.
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
Explain the lsmw and the steps involved in them.
Explain different inspection type you used .
What are all the steps involved in Variant Configuration?
We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?
How to insert an inspection checkpoint at the end of an operation?
Difference between MD01, MD02 and MD03.
What are the three 'mrp procedures'?
In the monthly lot size proc, how to generate lot at the end of Period?
Define stock requirement
Explain how the pp module is organized in sap?
What is mrp list and what is the use of it?
Difference between byproduct and co-product.
what is std info set? where it is used?
What is recursive BOM
Explain Availability check.