Hi If We know the plant:-

Input Initial Power Factor:-
Input Desired Power Factor:-
Input Load KW :-

Then we can cal the Required Kvar i.e capacity
of Capacitor bank...

Is This Answer Correct ?    25 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is mean by ideal infinite bus? why it is required to consider in fault short circuit calculations?

2249


What is phenomenon of electromagnetic induction and how it works?

630


Is there a standard depth of gravel fill in Substation Switchyard? Please give a design/drawing. Thank you.

4827


Please provided formula for calculate the cable size from step up transformer to M.V panel, run overhead aluminum cables, total load is 5mega watt, total length 900 feet.

1303


For RCD (Residual current device) Icu is defined. How i can find Ics for them?

1610






what kvrah y we need to take the readind of that

1580


what are the advantages disadvantages of connecting high voltage block( 1:1 transformers) transformers between the turbo generators and busbars.

1688


This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.

2020


please send the last 5 years {{{JUNIOR ENGINEER - ELECTICAL, ELECTRONICS RRB CHENNAI and secundrabad}}} TECHNICAL question papers TO MY EMAIL ID dinesh100701@gmail.com

1710


will there be any problem by recovering slip from single phase induction motors?

1444


How to design the no. of ceiling fans required in 5mtr X 10 mtr X 3 Mtr hight room?

1695


v/f drive basic princeple

2015


Dear sir my name Ankit i m Diploma holder present working in Welspun Corp ltd Anjar as Asst.engg (salary 14400/month ctc) i Would like to change my company also i have selected in ford India pvt ltd Sanand as trainee Tech with salary 12000/month so please suggest me for changing my job hope for *ve response

2437


STATE USE OF ARC RUNNERS & SPLITTERS ?

1476


how to select energy meter? have any calculation?

2398