What is meant by single cycle plan ?how it works?
Answer Posted / maria terence
Single Cycle plan is used to create for regular and
repeated periodic maintenance. Its used for simple
maintenance cycles. No straterge used in single cycle plan
Is This Answer Correct ? | 14 Yes | 1 No |
Post New Answer View All Answers
Which maintenance plan is suitable for managing outline service agreement and what call objects are required?
What is difference between system status and user status?
What is t code for deadline monitoring?
What is control key?
On the notification initial screen we select the notification type using iw21 t code. Is there any t code using which we can skip the initial screen and directly open the notification main screen?
How can a user differentiate simply between an equipment which has been charged and not charged for a service?
Why manufacturer field is important in equipment master and functional location master?
Where do we use multiple counter maintenance plans? Explain with an example?
How equipment master is integrated with asset master in fi module?
Which task lists are object based?
What is sap pm ?
Is it possible to assign user status to a sub-operation in maintenance order?
Suppose there is a difference between the planned and actual hours of internal manpower where will you document the reason/ cause of this variance. Is there any standard sap facility available to address such situation.
Which configuration setting allow a calibration order to trigger an inspection lot from maintenance order?
Is it possible to assign a user status to the operation and sub operation of a maintenance order?