Befor synchronissation of Generator what test to be carried
out.pl.specify with reason.

Answer Posted / vijay

Before Synchronisation mainly three conditions
(voltage,speed/frequency & Phase sequence) has to be
checked which are within the limits. Reason to monitor when
any one on this parameters found not in unique, DG set's
not getting synchronised.
If the synchronisation happened in unconditional status, it
causes unbalance current will flow in the operation and
load sharring is not even. To eliminate this kinds of
occurence Dark lamp test was carried out before execution.

Is This Answer Correct ?    9 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

defult setting in p220 micom motor proction relay for 11kv,640kw,f.l.a.-40a,1440rpm ht motor?

3234


What is the range of the stator resistance of 3 phase induction motor?

1461


What is a Phase shift meter? Where can I get one?

1671


why voltage form factor of PT are increase , when it is ecpected heigher spikes in system. how it is calculated.

1668


How does HT work & Voltage required?

1756






how to copy from plc ge fanuc versamax series,all input and output, adress, and printout.

2057


I have c license but I don't know eligibility of Max Kilo Volts under the electrical licensing board.

1229


Why an ac systems are preferred over dc systems?

647


please describe the Transformer setting, Motor setting, I/C setting, Tie setting

1273


Define peak overshoot.

807


What is an 86-P or an 86-A trip

1595


what things to be considered when designing UPS

1316


What are the various kind of cables used for transmission?

645


How to determine alternating current frequency?

704


How is operate breaker failure scheme in substation

1549