1)What is ur project architecture ?
2)how to move project from developement to uat?
3)What is the difference between datastage 6,7.1 and
datasttage 7.5?
4).How to do error handling in datastage?
5)3.Whta is unit testing, system testing and integration
testing?
6)What is the Exact difference between BASIC Transformer
and NORMAL Transformer?When we will go for BASIC Or NORMAL
Transformer
7)why we use third party tools in datastage?
8)What is the purpose of Debugging stages? In real time
Where we will use?
Answer Posted / hemachandra
Answer for 2 Question
2) By using the Datastage Manager we can move the project
from Dev to Uat.
.Through datastage manager Export the project into your
lacal machine as .dsx format (project.dsx) from DEV server.
.The same .dsx (project.dsx) import into UAT server by
using the datastage manager.
Is This Answer Correct ? | 21 Yes | 0 No |
Post New Answer View All Answers
How can you write parallel routines in datastage PX?
In Informatica,for the table I can find coreesponding dependent mappings.Likewise can I find the dependent jobs with all the information by using the table name
Difference between in process and inter process?
Define data aggregation?
Demonstrate experience in maintaining quality process standards?
What are routines in datastage?
What are the different plug-ins stages used in your projects?
Name the command line functions to import and export the DS jobs?
1)s.key generate 1 to 700 records today. tomorrow another 400 will updated how to update the records using s.key generator? 2)source is like :-- DB --> T/F stage1 --> seq1file T/f 1 is linking with T/F2 ---> seq 2 how to load the data? in source i given some conditions those r going in seq1. The another data will going to seq2 how to do this ?
What is process model?
What are the repository tables in datastage?
1.new record it will insert but changes of natural key is not present in taget i want to update (here key is composite natural key )can any one help this to explan how to do
What are the processing stages?
Which algorithm you used for your hashfile?
What are the steps required to kill the job in Datastage?