Did you handle any interior designing jobs?
Answers were Sorted based on User's Feedback
Answer / hanish sehgal
yes i handle the interior job but in my 6 month training in
ista hotel (amritsar) interior is very tough job
Is This Answer Correct ? | 3 Yes | 1 No |
Answer / j.antony mariadas
Having Sixteeen years of experience in
Architectural,interiors & Civil Engineering. I have reached
a level where I wish to consolidate upon my experience in
the above field. I have held a variety of positions
including Architectural Assistant, Project Engineer. which
have seen me to achieve excellent results.With more
emphasis on Site jobs, I have been a person in finalizing
and completion of various projects.I am looking for an even
more challenging and rewarding role where I can completely
devote the skills. I have acquired throughout my career.
I was in-charge for the following projects in CHENNAI-INDIA.
: M/s. Zylog Systems, - Office (G.F,I,II & III )
Civil, Architecture & Interior -
Siruseri, Chennai.
Cost of project – 1533 lakhs
: M/s. HCL ( BPO ) Technologies ( I & VI ),
Mini Campus – IT Park
Civil, Architecture & Interior -
Thooraipakkam, Chennai.
Cost of project – 592 lakhs.
: M/s. Cognizant Technologies Solutions ( G.F, I & IV )
Civil, Architecture & Interior – Sun Tech Park
Solinganallur, Chennai.
Cost of project – 880 lakhs
: M/s. Mehta Jewellery.
Civil, Architecture & Interior
Alwarpet, Chennai.
Cost of project – 145 lakhs
: M/s Lata Rampadran, Residential Bungalow
Civil & Interior Works.
Alwarpet, Chennai.
Cost of project – 24 lakhs
: M/s. Soma sekar, Residential Bungalow
Mylapore, Chennai..
Civil & Interior Work.
Cost of project – 30 Lakhs.
: Hotel Saravana Bavan,
Kenneth Lane, Egmore,
Civil, Architecture & Interior
Cost of project – 85 Lakhs.
: Hotel Saravana Bavan,
AshokNagar, . .
Civil, Architecture & Interior
Cost of project – 65 Lakhs
My response as follow as:
Site Execution, Tender Preparation
:
To co-ordinate with consultants.
:
Measurement Take off & Site inspection
:
Instructions to contractors.
:
Bill Checking & Certificate.
:
Quality control of Materials & Workmanship
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / b. malar mannan
Yes, I am Doing Interior Works...
Flooring in Trident Hotel
Flooring in GRT Grand Hotel
Flooring in Karnataka Tourism Train [Golden Chariot].
Flooring in Le Royal Meridien.
Interior Works in Kodaikanal [India Cement].
Interior Works in 10 Independence Villas in Chennai.
Interior Works in 52 Cinema Theatres in Chennai.
Is This Answer Correct ? | 1 Yes | 0 No |
how many brick in 1 cubic meter with mortar ?
what is the difference between onw way slab & two way slab?
what is the percentage of tolerance in the steel bars
what type pressure pipe use in sewerage & water supply?
how we can say that concrete is a plastic concrete
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
how much % of fine sand(jamuna sand)we can use with coase sand for making concrete.
all engineering filed in which branch mother branch
22 Answers L&T, Manoj Pharma Ltd,
what is the quantity of cement sand and metal in a 1m^3 m15 standard concrete
In colomn reinforcement when dia of bar is going to change, than what should be the lap length of bars weather it should be of heigher dia bar lap length or it should the accordance with new dia bar. the grade of concrete is same.
TWO EXAMPLES OF NET WORT REVENUES FROM BUILDING CONSTRUCTION
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band