Answer / maulik vyas
marshalling panels are used as interface between field
junction box & dcs control panel..
It also isolates the dcs panel from feild control panel..
| Is This Answer Correct ? | 133 Yes | 9 No |
Marshalling means grouping of I/Os. Marshalling panel is
placed between the DCS system panel and field instruments.
In marshalling panel grouping of I/Os like Analog Input,
Analog Output, Digital Input, Digital Output and Pulse I/O
are done.From marshalling panel the I/O signals are
communicated to the system CPU/Controllers through
Isolation/Signal conditioners.
In marshalling panel we can easily identify the Input or
Output and easy diagnosis can be done in case of fault
finding.
| Is This Answer Correct ? | 97 Yes | 6 No |
Answer / rajkumar
in addition to maulik points
3. marshalling cabinets location-- if located exactly will
save much cable cost and easy for maintenance people to
trace out cable routing and fault finding
| Is This Answer Correct ? | 53 Yes | 10 No |
Answer / muhammad fawad azim
FUNCTIONS:
Signal conditioning, termination, signal isolation, cold
junction compensation, field device power supplies.
| Is This Answer Correct ? | 15 Yes | 8 No |
Answer / rodney
There is a more practical reason for using a Marshalling Panel which becomes apparent if we imagine a multi-cable coming from the field and being connected directly to the I/O cards of a DCS. Whenever some kind of maintenance/test/check has to be performed just imagine the risk of interfering directly at an I/O card just to open some loop circuit. There would be the risk of touching another entry , loosing some bolt, and many other situations that could jeopardize the whole I/O card for some lack of other space specifically created to allow the proper access for maintenance and testing - the Marshalling Panel. Once the connections between all the I/O cards and a Marshalling Panel are done, tested and identified, no one wil have to deal with the I/O panel again, which means less risk and a proper place to do maintenance and testing, for there will be proper open/close connectors, fuses, isolators and all that the Project specifies.
| Is This Answer Correct ? | 8 Yes | 1 No |
i have steam drum height 1000mm. and i want to placed the transmitter below the tap.how i calculate.
Im having problems with interfase betwen SPI v7.0 and SPPID v5.05. Previous versions of Intools shoul be fixed with SPPIDproj.ocx file. It was necessary to replace this file with one that allows the connection between different versions of SPPID. It is necessary in the current version to do the same?Thanks
Shall we get the reading on level transmitter only by termination,without commissioning?
What is the GK Value in Flowmeter?
which flow meter is use for measuring the open channel flow?
Sir, I am working as a Instrument Engineer in Grasim Industries. Can any body provide question answer for interview purpose
give eg of how I/P is used in control loops
The wire is disconnected from the temperature sending unit (magnetic gauge). A voltmeter connected to the wire reads 0v. What does this indicate?
I have flow transmiter DP range is 0 to 5000mmwc,(convert) Display to be show in m3/Hr.
what is the usage of QDV & VOLUME BOOSTER.
What is loop checking ?
10 Answers Kharafi National, Petrofac, Samsung,
applications of plc in printing and packaging?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)