what is the formula for converting KW into KWH ?
Answers were Sorted based on User's Feedback
Answer / guest
just calculate the KW and multiply with running hours.you
will easily get KWH.
Is This Answer Correct ? | 15 Yes | 1 No |
Answer / newguy
KW/3600 = respected answer in kwh.
for example 36kw = 36/3600 kwh or 0.01 kwh
Is This Answer Correct ? | 4 Yes | 9 No |
Dear all i am kumaravel. now in chennai. my work is control and relay panel auto cad designing.up to 11kv to 400kv then question is i am improving my knowledge. i want some books name and auther are available for this C&R panel related. plese any one help me
I decided to provide a 11KV / 440V Xformer in my Substaion. What are the protection required for that?
difference between diode and scr?
How to calculate energy stored in a capacitance
when the size of the cable used for the ht voltage is 300sqmm then what is the size of the conductor of each phase
How to select the releases for MCCB ?
Dear Sir I am living in Jaipur Rajasthan now I did complete my b tech degree in electrical engineering in 2012 Sir how I gate certificate of competency for electrical supervisor
How to calculate the size of earth cable to earth the neutral of UPS ?
why dc supply is not applied for step up or down in transformer
if there are six generators (3 gas CATT, one Jenbacher o1 MW each, and two nos Diesel 01 no 01 mw other 0.65mw EDGs ( say), 3 CAtt gas set have identical pole pitch,01mw EDG and Jenbacher gas Set have different pole pitch, how their power connection can be done to connect a common bus bar during installation. in short, how different pole pitched generators power connection can be done to connect a common busbar system through generators incomer ACBs.
Dear Sir, we met a disaster with our 62.5 kva genset, after rewinding we informed by our contract engg that due to return current coming in neutral & impropper earthing this happend. But after all set up & load balance we checked & found again we have about 20 to 32 amp return current on neutral. we have 12 airconditioner + 12 mini fridge on single phase line. Pl suggest any idea to solved this problem