sir i have cleared the apti test of EIL held on 15th march
and my interview will be in new delhi on 2nd june.i will be
very much helpful if u help me regarding the type of
interview questions comes at
EIL.(URGENT.........PLZZZZZZZZZZ...............)
No Answer is Posted For this Question
Be the First to Post Answer
How Calculat the Cable Sizing of HT/LT System & Explian by one Exampal?
what is the distance maintained between the power and data cables with respect to the KVA .... plss give me the formula
How to conduct the Magnetic Balance test on Power Transformer?
what is the write prosidure of stringing of 8meter pcc pole.
What is the function of stater in tube light circuit?
how much load 15kva dg set can bear
How to determine alternating current frequency?
Hi ,what the accurate method to set correct(In) over load to protect the 3~ motor
we have one ups its neutral is not earthed.its one distribution MCB has a earth fault.but we can not put off any MCB.so how to find out that in which circuit is earthed without isolating the breaker.
What is load boxes ?
(In MEP services) HVAC in AC Plant room what else can we provide if the chiller is not considered?
Why two nos. un-tensioned wires are placed inside the PSC poles used by powergrid in RGGVY works.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)