I’ve heard that Zephyr, a test management tool saves the
trouble of sending weekly and monthly status reports. Is
that true?



I’ve heard that Zephyr, a test management tool saves the trouble of sending weekly and monthly s..

Answer / terencewill

You are absolutely right. You just have to put it up on
www.getzephyr.com so that everyone can see it.

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Testing AllOther Interview Questions

Foundations of Software Testing by Dorothy Graham, Erik Van Veenendaal,Isabel Evans ,Rex Black. i need this e-book please help me it is very urgent

2 Answers   ISTQB,


IF i have two columns in Database , While using Database output value ,allthe values in the two column are set as a single row in the QTP datatable, can u suggest me a idea so that QTP Runtime datatable displays the values as it is in the database

0 Answers  


Do you know what the mean of cmm and tmm?

0 Answers  


what is the exact difference between a product and a project.give an example

4 Answers   Wipro,


What is oo integration testing?

0 Answers  






I. Requirements are formally reviewed. II. Requirements are formally approved. III. Requirements are placed under configuration control. IV. Requirements are implemented in code. Using the above statements, when are requirements considered baselined? 1. I and II 2. I, II, and III 3. I, II, III, and IV 4. I only 5. I, III, and IV

0 Answers  


Explain interface?

0 Answers  


What is parallel/audit testing?

0 Answers  


what errors can occur when the page loads?

3 Answers  


What is the maximum length of cable supported in SCS-1,2 and 3?

0 Answers  


How to copy some tables in a DB to another DB in SQL Server

1 Answers   CybAge,


Given alone a functional specification docs if a test plan is to be prepared without any prototype and the product or the appli is to be delivered within 10 days ..How to prepare test plan and prepare test cases ? Cheers, Amar.gp

2 Answers   Wipro,


Categories