At present how many HVDC lines are there in india
Answers were Sorted based on User's Feedback
Answer / guest
at present in india there are three HVDC transmission lines
1)chandrapur to padghe(mumbai)--(1500 MW at ±500 kV DC)
2)rehand to delhi (1500 MW at ±500 kV DC)
3)talchal to kolar (2500 MW)
and projects in progress are:
4)ballia to bhiwadi(2500 MW)
5)bishwanath to agra(4000 MW)
Is This Answer Correct ? | 383 Yes | 72 No |
Answer / rajat kumar
at present in india there are three HVDC transmission lines
1)chandrapur to padghe(mumbai)--(1500 MW at ±500 kV DC)
2)rihand to delhi (dadri)(1500 MW at ±500 kV DC)
3)talchal to kolar (2500 MW)
and projects in progress are:
4)ballia to bhiwadi(2500 MW)
5)bishwanath to agra(6000 MW)
Is This Answer Correct ? | 145 Yes | 37 No |
Answer / ashish pankaj singh
presently there are 3 hvdc lines in operation and three
more lines in progress ie mundra- mohindergarh, ballia -
bhiwadi, bishwanath-agra.
one more hvdc project ner agra is in bidding state.
Is This Answer Correct ? | 65 Yes | 26 No |
Answer / unwaba
1.rihand-dadri
2.talcher-kolar
3.chandrapur-phadge
4.sasaram (back to back) going to shift to kolhapur
5.vindhyachal (back to back)
6.ballia-bhiwadi(first pole charged on 31st march-2010)
7.ner-agra(proposed)
Is This Answer Correct ? | 48 Yes | 17 No |
Answer / expert
at present in india there are three operating HVDC
transmission lines(not including B-to-B)
1)chandrapur to padghe(mumbai)--(1500 MW at ±500 kV DC)
2)rihand to delhi (dadri)(1500 MW at ±500 kV DC)
3)talchar to kolar (2500 MW)
and projects in progress are:
4)ballia to bhiwadi(2500 MW)-first pole charged as of 31st
March 2010
5)Mundra-Mohindergarh(Adani group-first Indian private
HVDC)-in progress,completion by 2011 end.
6)Bishwanath/Chariali to Agra(6000 MW)-recently awarded to
ABB-BHEL
Is This Answer Correct ? | 41 Yes | 15 No |
Answer / manoj kumar
1-Rihand to Delhi (Dadri) 1500MW
2-Talchal to kolar (2500 MW)
3-Chanderpur to Padghe (Mumbai)
Project in Progress
4-Ballia to Bhiwadi (2500MW)
5-Bishwanath to Agra (6000MW)
6-Mundra to Mohindergarh
Is This Answer Correct ? | 23 Yes | 9 No |
Answer / gandhi pratik
at present in india there are three operating HVDC
transmission lines(not including B-to-B)
1)chandrapur to padghe(mumbai)--(1500 MW at ±500 kV DC)
2)rihand to delhi (dadri)(1500 MW at ±500 kV DC)
3)talchar to kolar (2500 MW)
and projects in progress are:
4)ballia to bhiwadi(2500 MW)-first pole charged as of 31st
March 2010
5)Mundra-Mohindergarh(Adani group-first Indian private
HVDC)-in progress,completion by 2011 end.
6)Bishwanath/Chariali to Agra(6000 MW)-recently awarded to
ABB-BHEL
Is This Answer Correct ? | 20 Yes | 13 No |
Answer / sumit tiwari
1.Back to back at rehand
2.Singrauli- Delhi
3.Ramagundam-Chanderpur
4.Visakhapatnam-Araku
5.Barsoor-Sileru
6.Bihar shariff-Mau
Is This Answer Correct ? | 1 Yes | 0 No |
diffance between eletrical and eletronics?
in general it is observed in power stations, the tertiary winding is used in higher rating Y-Y auto transformer but not in Y-Y power transformer. is the tertiary winding is compulsory then why it is not using in power transformer
hi friends if you have any 400KV Substation Erection and installations Drgs please send to me.My email id:kandi.suresh441@gmail.com
Thumb rule of cable size(rm>30 rm)X multiplying factor=ampere
0 Answers Kazi Farms, SKI Carbon Black,
Q. calculate the value of the resistor to be connected in series with a 100W; 230V lamp so that the wattage of the lamp is reduced to 35W
what happends when an isolater is operated on on-load
What is the scale analysis for condensor of HVAC system
Why restricted earth fault protection is needed? Why can’t differential Protection is sufficient?
How can we convert dc to equivalent ac??
In transformer which temp should be less oil temp are winding temp?
How to increase the specific gravity of DG batteries?
How we can calculate what type of supply we need for an example sometimes we take 11 KV and sometime 33KV from EB ?