Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


hi, How would you define the QA and QC?

Answers were Sorted based on User's Feedback



hi, How would you define the QA and QC?..

Answer / sujatha

Qa is quality assurance. the main responsibility of a QA member is to ensure
that the standards r followed and to develop the methods as to make the
software development process smooth and to prevent the bugs from ever
ocurring.

QC is quality control. the main responsibility of a QC member is to find the
bugs, find them as early as possible and make sure that they get fixed.

Is This Answer Correct ?    4 Yes 1 No

hi, How would you define the QA and QC?..

Answer / k sridharan

Quality Asurance veryfy the all documents

Quality Control to check the application as per requiremant

QA done in pre_execution period

QC done in post_execution period

QA done by Quality Analiser

QC done by Tester

Is This Answer Correct ?    3 Yes 0 No

hi, How would you define the QA and QC?..

Answer / gaurav

Quality Assurance : A set of activities designed to ensure
that development and maintaince process is adequate to
ensure the system will its requirement. Qa is done by QA
member. Its to ensure that process is defined and
appropiate .QA rewie will focus on the process elements of
projects. Eg whwther req are defined at proper level or not.


Quality Control : A set of activities designed to evaluate
a developed work product. Focus on the Product oriented.
focus on finding defects in specific deliverables -e.g.,
are the defined requirements the right requirements

Is This Answer Correct ?    3 Yes 1 No

hi, How would you define the QA and QC?..

Answer / lokesh chauhan

Both above two answer are correct but in short we can say
Quality assurance is a verification phase while
Quality control is a validation phase.




Plz correct me if i m wrong...
Regards..
Lokesh Kumar Chauhan
lokesh_kumar_chauhan@yahoo.com
Mobile - 09350229669
Noida

Is This Answer Correct ?    2 Yes 0 No

hi, How would you define the QA and QC?..

Answer / siri

To say more clearly related to the answer posted by Lokesh
chauhan The verification phase includes information
gathering,Analysis,design and the coding

the validation phase includes system testing and maintenence.

Is This Answer Correct ?    0 Yes 0 No

hi, How would you define the QA and QC?..

Answer / surii

Quality Assurance : It is a proces in which every role and
his responsibilities are monitored and guided in such a way
that he accomplishes the task as per guidelines and quality
standards to provide quality of the product at the end.
Quality assurance is also called as Verification.

Quality Control : It is a process in which inspections and
auditings performed on the roles and responsibilities to
segregate bad process and elements from good ones. It is a
one type of controlling process. Quality control is also
called as validation.

Is This Answer Correct ?    0 Yes 1 No

hi, How would you define the QA and QC?..

Answer / charjras surana

QA-Quality assurance is a planned and systematic pattern
for all action necessary to provide adequate confidence
that the item or product confirms to eshtablish technical
requirement.

QC-In the quality control we compares the product with
application standard is to ensure tha all quality
requirements are being met.

---- c.surana82@gmail.com(09986697771)

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Manual Testing Interview Questions

can anyone tell me process of how the bugs r reported by testers??n after reporting bugs is the work of test engineer finished or still he has to do any thing????

1 Answers  


How client/server application is complex?

1 Answers   IBM,


If one testcase takes 24hours to execute.what will be the status u will be giving to it?and wht u will report to ur TL?I mean to say will u include the above testcase or exclude it?plz suggest me with the exjact answer.

3 Answers   Kanbay,


Can any one say me how to do Performance testing step by step plz for a desktop application(offline application).all the data is stored in internal server itself can any plz help me. ts quite urgent friends.

0 Answers  


can we give special characters in password

2 Answers   Infosys,


What is Performance Testing?

2 Answers  


what is the FURRRPSC model?

2 Answers   CTS,


what is the role of a test build manager?

2 Answers   Wipro,


What is difference between http and https

5 Answers   AZTEC,


How u test 3 Drop Down menu means one is for state,other is for city and Pin code test these drop down

2 Answers  


any body can explain me door lock test cases,cell phone test cases, table and chair test cases

6 Answers   CSC,


I want to know all detail of v model phases

3 Answers  


Categories