If i want to build 230kv substation what are the equipments
to be installed?
Answers were Sorted based on User's Feedback
Answer / manoj k mishra
if you want to install 230kv substation you need to have
following equipments....
1.CTs
2.PTs
3.Lighting arresters
4.insulators
5.Transformer for stepping the volatage down
6.Circuit Breakers
7.contactors
8.BUS BARS
Is This Answer Correct ? | 38 Yes | 8 No |
Answer / raju
First you need good consultent to design a 220kV Substation.
Is This Answer Correct ? | 21 Yes | 4 No |
Answer / prodip das
Requirement
1.A suitable land
2.Suitable Environment
3.Proper Distance from City or population area
4.Easy communication
5.Efficient Technical manpower
6.X-former(Step down)
7.Busbar
8.Isolator
9.Circuit breaker
10.Lightining Arestor
11.CT & PT
12.Control Pannel
13.PLC(power line carrier)
14.Stone for proper capacitance
Is This Answer Correct ? | 20 Yes | 3 No |
Answer / viswanathan karthikeyan
Basic Concept :
Incomer
Outgoings
Main Incomer -Cable or OHL LINE -PLEASE CONSIDER
STEPDOWN AUTO TRANSFORMER-220/132kV
NEXT AGAIN STEPDOEN TRANSFORMER-132/33Kv
stepdown Transformer-33/0.415kV
MAIN INCOMER NEED CIRCUIT BREAKER
220KV GIS
132KV GIS
33KV GIS
IF OHL LINE MEANS
gantry
WAVE TRAP
SURGE ARRESTER
COUPLING CAPACITOR
AAAC CONDUCTORS,TOWERS ETC(d0,d2,d6,d9,dt)
CABLE MEANS
220KV CABLE
CONTROL AND REALY PANELS
220,132,33 FOR RELAY AND PROTECTION PANEL
LV,HV,EHV CABLES
EARTHING MATERIALS
EARTHING AUXILLARY TRANSFORMER]
NEUTRAL EARTHING TRANSFORMER
TELECOMMUNICATION PANEL
SCS SYSTEM
BATTERY AND BATTERY CHARGES
EOT CRANE
PUMPROOM
LIGHTING AND LIGHTNING PROTECTION
EARTHING MATERIALS ETC
SO MANY ITEMS REQUIRED
I AM DOING THIS TYPE OF PROJECT
IF ANY DOUBT ,PLEASE SEND MAIL TO ME-vkn.1980@gmail.com
Is This Answer Correct ? | 12 Yes | 2 No |
Answer / latha
To build a 230kv substation one needs
1.suitable land which is in industrial area
2.step down transformers with proper cooling systems
3.current transformers,potential transformers
4.current arresters
5.buses
6.transmission lines
7.circuit breakers
8.proper earthing facilities
9.skilled engineers,good maintanence faculty
10.control room which consists of relays circuit breakers
for protection scheme
11.air compressor unit
12.batteries and battery chargers
12.contactors
13.GOS
Is This Answer Correct ? | 7 Yes | 0 No |
Answer / karthik.g
if you want to install 230kv substation you need to have
following equipments....
1.100MVA Transfomer
2.220 & 110 CB,CT,PT,Isolator,C&R Panels,LA,Insulator
3.PLCC equipments (if need)
4.110V & 50 V LT Switchgear
5.110V & 50V Battery & Charger
6.steel structure (for equipment erection)
7.120KN Disc Insulators (Normal)
8.Al.Bus Bar
9.Insulator hardware
10.Bolts & NUts
11.Conductor
12.earth wire
13.connectors
14.Marshaling Boxes & junction Boxes
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / loruenser
Mind quality connectors, as a very vital part!
Is This Answer Correct ? | 0 Yes | 1 No |
I have a 380 KVA DG set. How can i find out 1. My Fuel Consumption per hr ? 2. Electricity produced in 1 Hr. ? 3. If load varies then how does it affect fuel consumption & electricity produced ? Please HELP !!! Really need an answer.
How much sq,mm cable need for 800 amps load
in 31.5 mva power transformer how to set of wti and oti?
how to calculate cable size for the motor
what the is the distance between 110kv termination point and the ground. how to calculate
how to check three phase motor torque value?
what is the concept of star delta starter?
A resistance, inductance & capacitance are connected in series between points A & B.The voltage drops across the resistance,inductance&capacitance are found to be 40V,70V&100V respectively. What is the total voltage between between points A&B (Vab)? a)210V b)70V c)50V d)230V
what is residuel magnetism. and how order lead acid batteries for 24 volt. emergency lighting system.
A d.c. Shunt motor is found suitable to drive fans because they require?
for selection of transformer we will considering 5 to 6 times of starting current of higher rating motor connected to secondary side. according to process wise we will start the motors gradually suppose if we will start 15 to 20 motors at a time wat will happen?
how air lock will be removed from generators, how it happens?