Which is not formally included in Test Plan?
1)Features to be tested 2)Incident reports 3)Risks 4)
Schedule Pls reply .Thanks
Answers were Sorted based on User's Feedback
Answer / uday
i think as per my knowledge Incident reports are not
included in Test Plan. actually Test plan conatins:-
1)Test Plan Identifier
2)Introduction
3)Test Items
4)features to be tested
5)Features not to be tested
6)test Approach
7)items pass/Fail Criteria
i)Entry criteria
ii)Exit Criteria
8)Suspension Criteria
9)test Deliverables
10)Environment
i)technologies
ii)Languages
iii)Software
11)roles & responsibilities
12)Staffing & Training Needs
13)Schedule
14)Risks,Contingencies and Assumptions
15)Approvals
Please Inform me If Any Thing Wrong.
uday
uday_testing@yahoo.co.in
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / sneha
The option is 2)Incident reports is not included in test
plan
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / sampath
Compatibility testing is not look and feel, it is
applications compatibility with the computing environment
(hardware, network, OS, Database, borwsers, etc)
Look and feel means usability testing.
Is This Answer Correct ? | 3 Yes | 2 No |
Answer / prashant
All those who have written "Incident Report" are absolutely
correct.
Is This Answer Correct ? | 1 Yes | 0 No |
To include:
Features to be tested since some of them can be test at
rela time for some of them we can test using simulator.if
we give them what we r testing then at other end they can
arrange for other cases.and also some internal features
also we cant test just like internal memory or addresses.
so its mandatory to include it.
Risks: here we might be saying some risks like environmenmt
supports or operating systems we using,language dependent
issues.
assumptions and constraints also we can include in test
plan.
schedule: conveying them about our flow of testing which
means first we perform GUI testing,fucntionality
testing,integration and system.
But incident reports is not necessary.Because we would be
updating our test plan usually.
So if we are facing incident then we need to analyse it and
add it to the test plan by adding either in risky
section,constraint section..incase if it can be overcome by
any other testing methodology then we can add those in our
testing technoque
Is This Answer Correct ? | 0 Yes | 0 No |
hai uday .this is sunithayagnamurthy.she is asking what is
difference between wht is compayability and system
testing.........
compatability testing means
it is verify look and feel
the color is good or not etc
system testing: means it is like blockbox testing
to verify the functionality is working according to the
customer requirment this is system testing......
if any mistajes is thr please excuse
Is This Answer Correct ? | 1 Yes | 5 No |
What is the difference between alpha testing and beta testing
Is compatabilitytestig and port testing are same
is script is same like test cases?
Hi Everybody ,how can i explain the testing projects in the interview point of time? Please let me know .if it is insurance project, what procedures can i follow ?
hai, pls. explain V-Model clearly. Pls. give me guidience how to explain V-Model in interviews?
Give me different methodologies used in testing?
Suppose there are three modules A-B-C, the output of A is responsible for B and output of B is responsible for C and if A & C is not ready & B module is ready then how can u check Module B
Explain Application boundary?
How to write test case for view the table(i.e it is already stored in database and see the content in the table)
When do u stop testing?
Is it possible that there can be number of test cases? Mean to say 500 or 1000 test cases? Reply me as early as possible.
What is your framework of current project