how u migrate reports to cognos 8 from previous versions
Answers were Sorted based on User's Feedback
Answer / s.srinivas
Migration means report net reports to cognos8.rn
upgrade .bat/rs upgrade .sh is a stand alone utility that
upgrades a single report specification at a time out side
of the cognos.
Is This Answer Correct ? | 2 Yes | 2 No |
Answer / ran
Using Migrating Tools we are able to Migarte reportes from
Old versions to Cognos 8..
---arch2fm for WINDOWS
---impcat2xml For Windows
---migratetoc8 For Windows
---deploytoc8 For windows and Unix,AIX
Is This Answer Correct ? | 1 Yes | 1 No |
describe the starschema grouping ?how can i add a new column for existing report ,when it is not present even in model & dataabase?
what is materialised view? why we use it in data warehousing?
Can you define query studio?
My problem is as follows I made two pages of the portal; in the first page i have two reports and from one of these i would like to communicate in some way (i.e drill- through?) with the second page that contains four reports (prompt value [product] and three chart [sales revenue, sales quantity and budget]). Particularly I would like to communicate with the report that contains the prompt, passing the Product. How can i drill from the first page of the portal to the second page ? More generally, is it possible to move from one page, containing 2 report, to another page with 4 report, through a drill-through or any other mechanism? Thank in advance.
What are the advantages of shortcuts?
What are the components required for the application tier?
How to join multiple db in catalog?
what is hints in cognos and where we use it.
What is meant by alternate drill down with ex?
How to move reports one server to another server?
what is power prompt in cognos ep7series?what is the use of this?
what is crosstab space