What is missing report and how to prepare
No Answer is Posted For this Question
Be the First to Post Answer
What is the difference between Backfilling & Refilling in Earth Work Group Item ?
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
What is the density of steel? what is the IS code for steel structures? 1t/m2 = ?KN/m2 ??
Machine mix is better than hand mixing to get––
this is jagdesh from vizag, IM GOING 2 ATTEND BHEL interview on 14th dec. im a civil engg. graduate. plzz let me know the pattern & few questions of the interview if possible. plz reply at jd_marc@yahoo.com
I am planning to construction in my plot in Pune (Chandan Nagar) and its near about 1950 SqFt. Can some plz help me on the rate on per sqft for RCC,Brickwork & Plaster,Flooring,Water proofing,Door. Thank you in advance
What is a hatch patterns?
1 cum of 60*25*25 block cost 187 dirhams. Find the cost of 1 sqm of block ?
what are the types of dams
what"s the merits and demerits of hollow blocks comapre than to bricks?
M30 me kitan pani lagat hai
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)