what is the material consumption of 1:2:4 by kilogram?
Answer / prasannakumar9866332654
For Cum
Cement - 280 Kg
Fine Agg - 753 Kg
Coarse Agg 20 mm - 780 Kg
Coarse Agg 10 mm - 458 Kg
Water - 154 Liter (Slump 90-110)
Add Mixer - 1.7 Liter
| Is This Answer Correct ? | 5 Yes | 2 No |
What is the primary difference between adsorption and absorption?
HOW TO CALCULATE REINFORCMENT IN STAIRCASE CRANKED BEAM
What is Aggrgate sizes used in a WMM Plant?
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
In BBS,Find out the cutting length for a 2000*2200 column with 50 mm cover?
What is meant by engineering drawing?
How can i find number of brichs required for given quantity of wall in m^3..
5 Answers vasanth construction,
when does sedimentation occur before filteration, along with it, along with chlorination, after chlorination?
how can calculate qty of steel required for one or two ways slabs..
How much cement and water required for cement selery????
how many cubic centimeter in one unit of sand?
Can any colleague send me the steel frame pictures of roofs, beams, columns, footings, roof bends, door bends etc. I shall be very gratefull.Suhail_akhter@hotmail.com
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)