A building wall is to be constructed , its 12 ft high and 40 ft long and labour cost per foot is 100 rupees , tell me the total cost of labour for that building work plz explain answer ..I am hurry plz any one give me ans as immediately as possible Thanx



A building wall is to be constructed , its 12 ft high and 40 ft long and labour cost per foot is 100..

Answer / pritamdebnath

Here , the cost will be charged on the basis of per ft square . Total area covered 40 × 12 = 480 .
As per ft required cost is 100 ,hence for 480 square ft ,total labour costs will be 480 × 100 = 48000 rs

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

What is the difference between Fe500 and Fe500D rebars in their appearance and also is there any change in their Yield Strength of these rebars?

1 Answers   Ripple India,


As an engineer, what u should do when the construction of a building doesn't meet the required specifications?

9 Answers  


convert area- 1 war = meter, 1 guntha = meter

2 Answers  


As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low

0 Answers  


how much steel and concrete required for 450 sft slab? tell also the method

1 Answers  






How can we make a hole in a solid rectangle using solidsworks?

0 Answers  


1.(a.) how do you calculate the volume of mortar for 1 piece of block 450mm x 225mm x 225mm. (b.) calculate for 1sqm

1 Answers  


How to calculate soil bearing capacity of soil?

1 Answers  


Basic civil interview questions 

0 Answers   IOCL, SSC,


Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? Regards,

45 Answers   CDS, L&T,


what is the percentage of binding wire required for 1 mt of steel binding in gerally

5 Answers  


How manu days after the casting of a slab another slab can be casted above it? what is the total curing time of a slab if ponding is not done on it?

6 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)