Why silt content not allowed more than 6% for Sand ?
Answers were Sorted based on User's Feedback
Answer / naveen dixit
maximum silt content 3% as per is 383;1970 . 3 % up not using civil construction .
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / reaman man
as per IS 383:1970 the percentage of silt should be kept as low as possible,ideally less than 3%. Higher percentages of silt can cause appreciable reduction in the Compressive Strength of concrete.
| Is This Answer Correct ? | 4 Yes | 0 No |
Full from of ACC
1 cum of 60*25*25 block cost 187 dirhams. Find the cost of 1 sqm of block ?
what is pile foundation?
a butt weld is specified by
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
how to calculate spacing rod in column
why we are doing post tensioning in beams and slabs. it is economical compare to rcc? how?
What is the sugested procedure of water purification for public supply?
What is the unit weight of cement,sand,Brick,Reinforcement concrete
why we do multiply 1.54 for dry volume of concrete?
what is injection grouting and what is rewiring.
how you can say about a slab that it is one way or two way.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)