L/3 and l2 and 1.5l is use for reiforcement
Answer / abbas haider
L for span of structure part and 2 is half
Is This Answer Correct ? | 6 Yes | 0 No |
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
How steel required for 823 sqm of flooring work in 150mm c/c in single jali?
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
What is tha cross secional area of cover block
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
How to calculate the amount of Brick,cement & sand required for 1 cum of 230mm thick brick work with ratio 1:5 please give me an answer with detailed step
31 Answers Assurance, Design Ideas, Jeno Maran Builders, Lanco, NamPower, NCC, Prime Adhivas Contrats, Simplex, SSM, SSM Builders and Promoters,
what are the changes in concrete pour height as per IS 456, 2009?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
How is calculate the cube molt
how water proof chemicals act in concrete to avoid leek?
0 Answers DDF Consultants, NSL,
What is line killa
which type of crust is best suitable to develop flexible pavement in rural roads i.e either with wet mix macadam or Water Bound Macadam and its reasons.