How to find the requirement of cement and sand for the 1cum of rr masonry work
Answer / s k majumder
First one have to choice grade of Concrete. Say M15 grade for which proportion is 1 : 2:4. total 7
N Now dry volume will be of 1 cum concrete is 1*1.52=1.52 cum
Hence
cement= 1.52/7 = 0.217cum = 7.66cft = 6.12 bag say 6 bag
sand (1,52/7)*2 = 0.434 cum= =15.33cft
Aggregate(=1.52/7)*4 =0.868cum= =30.66cft
Is This Answer Correct ? | 1 Yes | 1 No |
in m45 what does m and 45 refers
During reclamation how can the occurrence of mud waves can be rectified?
What is the order of MIX Design of concrete? a)Cement :Stone:Sand b)Cement :Fine aggregate :Coarse Aggregate?
what is studds? where it can be done?
what is steel consumption for high rise building column, beam, slab,footing
difference between ordinary portland cement concrete strength and pozzolona portland cement concrete strenth
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
can u plz send me ntpc placement papers(civil engineering) at munjalricha1988@gmail.com and which types of questions are aked by ntpc
what is the m25 test result 7 days 14 days
why do we not deduct volume of steel to find actual volume of concrete in practical???
How to calculate quanty of steel in four leg stirrups?
What are Standard weights for concete of gradeM10,M15,M20,M25,M30 Etc.