Difine coffer dam ?
Answer / elina lakra
A temporary dam constructed to exclude water from a specific area to take up construction in dry area.
Is This Answer Correct ? | 2 Yes | 0 No |
what is the load acting on the sides of the water tank
How to calculate the thickness of the rcc slab?ll u pls tell the formula?
Difference between overlap and development length of rod. Thanks.
Let suppose A building wall is 12 ft high and 30 ft long and labour cost is 100 rupee per feet so calculate the total cost of labour and also explain in detail...plz ans me immadiately i am hurry Thanx
what is the difference between red bricks& cement bricks
I want to calculate the footing 90º L bend as a techincaly
Construction joint of beam & slab is provided at––
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
plz tell me one brick total plaster area?
9 Answers Aparna Constructions, Aparna Enterprises, L&T,
Define Workability ?
when we select buildup beam
How to convert sqft in cft